Tokyo Electron

Makes deposition, lithography-track, etch, cleaning, probing, and bonding equipment for semiconductor fabs. Its portfolio supports both wafer fabrication and advanced packaging.

HQ JP LithographyDepositionEtchTestAdvanced packaging and HBM

Verified

Visit Tokyo Electron Compare with others Request a quote

Facts

Source per value
Process step The main fab or back-end step the company sells equipment for, our grouping of the process steps in its cited product material. "Several steps" means three or more.
Several steps 1
HQ country Country of the corporate headquarters or principal corporate address stated by the company.
Japan 3
Process steps covered Manufacturing or test stages covered by the cited equipment; illustrative rather than an exhaustive company portfolio.
Deposition; lithography coating/development; etch; cleaning; testing; bonding/debonding 1
Tools and product families Named equipment models or product families supported by the cited vendor material.
CLEAN TRACK LITHIUS Pro DICE coater/developer 1
Target devices and applications Device types, materials or production uses the source states for the tool.
LITHIUS Pro DICE supports EUV including High NA 1
AI-relevant tools True where the vendor or its filings tie a named tool to AI, HBM or AI data-center chips. Empty means the link is not in our sources, not that none exists.
Yes 2
AI-relevant tools (detail) The tool and the AI, HBM or data-center link, as the source states it.
Etch for logic/HBM interconnects; temporary wafer bonders/debonders for HBM 2
AI inside the equipment AI or machine-learning functions the vendor describes in its inspection, metrology or equipment analytics. Not the same as chips made for AI.
Not published
Wafer or ingot diameters mm Model-specific diameters in mm. Crystal-growth entries refer to ingot diameter. Twelve-inch wafers are nominal 300 mm.
LITHIUS Pro DICE: 300 1
Operating wavelength nm Light wavelength of the named lithography or inspection tool.
Not published
Patterning resolution Model-specific resolution or minimum linewidth with the vendor’s qualifiers. Not interchangeable with a process-node label.
Not published
Alignment, overlay or probing accuracy The vendor’s own overlay, placement, alignment or probing metric with units and statistical definition. Metrics are not directly comparable across vendors.
Not published
Rated throughput Vendor-stated model throughput with units and test conditions; dry-cycle and maximum rates are labelled.
Not published
Technical capabilities Model-specific process ranges, configurations or capabilities. Comparative performance claims are attributed to the vendor.
Not published
Batch or chamber capacity Wafers per batch or process chambers, for the cited model.
Not published
Process or test temperature °C Temperature range or limit for the named equipment, with configuration qualifiers.
Not published
Substrate or die dimensions Model-specific substrate, panel or die dimensions and units.
Not published
Wafer inspection coverage % Inspection coverage the vendor states for the named capability. It is not a defect-detection rate.
Not published
Automation and integration Material handling, maintenance or factory interfaces supported by the cited model.
Not published
Annual revenue Total company revenue for the fiscal year named, from the annual filing or annual report, in the reporting currency. Includes any non-equipment segments the company has.
¥2,431.5 billion net sales, fiscal 2025 (year to 31 Mar 2025) 2
Market share or position Segment-specific share or ranking claim, with year and geography. Vendor claims are labelled as claims; segments are not comparable.
CY2024 worldwide: coater/developer 92%; deposition 28% (ALD 16%, CVD 38%, oxidation/diffusion 37%); dry etch 27%; cleaning 21%; wafer bonder 32%; wafer prober 38% 2
Market-share basis Research provider, measurement basis and period behind the paired market-share figure.
TEL chart (FY2025 Q4 deck, slide 27) based on Gartner 2024 WFE share, revenue-from-shipments basis, calculations by TEL; wafer prober from TechInsights auto-prober data (Apr 2025) 2
Installed base or shipments Dated cumulative shipments disclosed by the vendor. Shipments are not necessarily active installed systems.
Not published
Customers Customer types or named customers in the source.
Not published
Commercial or corporate status Dated product adoption, qualification or pending corporate transaction.
Not published
Product launch Dated product announcement or sales launch, with context.
Not published
Headquarters Corporate headquarters or principal corporate address as the company states it.
Tokyo, Japan 3

Sources

  1. tel.com / product accessed 2026-11-11
  2. tel.com / fy25q4presentations e accessed 2026-11-11
  3. tel.com / 62 01e accessed 2026-11-11

Get a quote from Tokyo Electron and similar companies

Tell us what you need once. We send it to matching companies and they reply to you directly.

Quote requests open shortly. To get in first, email hello@semiconductorequipmentlist.com.